We have some solid Projects under our (tool) belt…
Managing Director John Neesham and the Neesh Construction team have delivered outstanding services to a range of high-profile projects across Perth. Whether your project is big or small, you can rest assured; our previous work demonstrates our first class standards. View some of our developments here.
project
history
PROJECT | CLIENT | LOCATION | BRIEF DESCRIPTION | VALUE | COMMENCEMENT |
---|---|---|---|---|---|
Garden City Early Works Package 5 | Scentre Group | Garden City Shopping Centre, Riseley St, Booragoon | Construction of a new HV Switchroom to Western Power Requirements comprising miscellaneous builders work including excavation, concrete, formwork, reinforcement, suspended bondek slab, core filled blockwork, fire rated timber doors, structural steel to support electrical switchgear and all associated finishing works | $200k | 2018 |
Garden City Early Works Package 2 | Scentre Group | Garden City Shopping Centre, Riseley St, Booragoon | Construction of a new fire control centre to cater for the proposed major redevelopment works to the existing Garden City shopping centre. Works included excavation, concrete, formwork, reinforcement, structural steel, core filled blockwork, aluminium work and glazing, paving, landscaping, roof cladding, ceilings and wall linings, miscellaneous carpentry and joinery and the associated final finishing works | $850k | 2017 |
Garden City Investigative Survey Locations | Scentre Group | Garden City Shopping Centre, Riseley St, Booragoon | Supply and installation of access panels to existing mall area ceilings and vertical bulkhead faces allowing investigative works by services engineers to take place | $50k | 2017 |
BPI Westin Hotel Composite Cladding and SS Wire Works | BPI (BGC Construction) | 480 Hay St, Perth, WA 6000 | Installation of architectural feature composite timber cladding to steel beams and columns including fabrication, supply and installation of stainless steel wires and associated stainless steel componentry | $1m | 2017 |
Woodside Fitout – Carpentry | Multiplex | Capital Square Site, corner of Sprint St and Mount St, Perth CBD | Supply and installation of non-fire rated solid core doors with feature timber veneer, fabric, timber dowel, whiteboard metallic laminate and polished plaster finishes to new 30 storey commercial office tenancy fitout. Supply and installation of Royal Oak timber flooring. Supply and installation of 30 levels of base build inter-tenancy stair, lift lobby wall and floor protection during the fitout period. Supply and installation of miscellaneous stainless steel and metalwork items. Supply and installation of 950m2, 50mm thick cementitious grout topping slab to a training and induction centre. Supply and installation of miscellaneous FFE items. | $2m | 2017 |
NMP Early Investigation Works | Multiplex | Perth Museum, James St Northbridge | Access hatch cutouts to existing timber flooring, plasterglass ceilings and walls to allow engineer access for investigative works. | $50k | 2017 |
Westfield Innaloo Stage One Early Works | Scentre Group | Westfield Innaloo Shopping Centre, Ellen Stirling Boulevard, Innaloo | Construction of 4 new HV Switchrooms to Western Power requirements to facilitate the upgrade of the Westfield Innaloo Shopping Centre. Works included excavation, concrete, formwork, reinforcement, suspended bondek slab, core filled blockwork, fire rated timber doors, structural steel to support electrical switchgear and all associated finishing works | $850k | 2017 |
Capital Square Podium | Multiplex | Capital Square Site, corner of Sprint St and Mount St, Perth CBD | Supply and installation of 1,200m2 of composite timber decking. Supply and installation of 170 solid core and fire rated timber doors. Supply and installation of timber carcasses to wet area vanities located within lowrise building areas. Supply and installation of temporary access and amenity works. | $900k | 2017 |
Innaloo Travellator Replacement and Lobby Upgrade Works | Scentre Group | Westfield Innaloo Shopping Centre, Ellen Stirling Boulevard, Innaloo | Upgrade of an existing lobby entrance including existing travellator removal and reinstatement of new. Works included demolition, hoardings, structural steel, aluminium and glazing, tiling and stone, wall and ceiling linings, roof and wall cladding, management of service Contractors including lift, hydraulic, mechanical, fire and electrical and all associated finishing works. Works also included the defit and refit of Coffee Club retail tenancy. | $1.6m | 2017 |
Neesh Construction Head Office Fitout | Neesh Construction | 32a McCoy St, Melville | Internal and external existing light industrial building refurbishment to create a new head office commercial building for Neesh Construction. Works included demolition, concrete, formwork and reinforcement, structural steel, blockwork, aluminium and glazing, roof and wall cladding, tiling and stone, joinery and carpentry, electrical, hydraulic, mechanical, security, IT & Comms, landscaping, decorative concrete, fencing and miscellaneous FFE and finishing works. | $1m | 2017 |
Scentre Group Head Office Fitout | Scentre Group | Mill St, Perth CBD | Fit out of Scentre Group Perth head office tenancy. Works included demolition, ceiling and wall linings, services, joinery and carpentry, tiling and stone, aluminium and glazing, painting and all required finishing works. | $800k | 2017 |
326 Rokeby Rd Subiaco | Swanline Group | Rokeby Rd, Subiaco | Internal and external existing retail building refurbishment to create a new head office commercial building for Swanline Group. Works included demolition, concrete, formwork and reinforcement, structural steel, blockwork, aluminium and glazing, roof and wall cladding, tiling and stone, joinery and carpentry, electrical, hydraulic, mechanical, security, IT & Comms, landscaping, miscellaneous FFE and finishing works. | $650k | 2016 |
Carousel Food Court Ambience and Amenities Upgrade | Scentre Group | Westfield Carousel Shopping Centre, Albany Highway | Existing 2x foodcourt and 2x amenities refurbishment. Works included demolition, concrete, formwork and reinforcement, hoardings, structural steel, blockwork, aluminium and glazing, ceiling and wall lining, tiling and stone, joinery and carpentry, electrical, hydraulic, mechanical, landscaping and miscellaneous FFE and finishing works. | $3m | 2016 |
Innaloo Shoppers Village | Scentre Group | Westfield Innaloo Shopping Centre, Ellen Stirling Boulevard, Innaloo | Refurbishment of a male and female amenities including demolition, hydraulics, electrical, tiling and stone, joinery and carpentry and all required finishing works. | $100k | 2016 |
Mandurah Forum Expansion Project | Multiplex | Mandurah Forum Shopping Centre, Pinjarra Rd, Mandurah | Supply and installation of a 165 metre long temporary shoppers access tunnel constructed with Bondor EPS wall and solar span roof panels. Miscellaneous structural hoardings dividing the existing shopping centre and the new redevelopment works. Supply and installation of a feature green wall including custom fabricated and polished ply panels lining the walls adjacent to the travellator. | $550k | 2016 |
Capital Square Temporary Amenities | Multiplex | Capital Square Site, corner of Sprint St and Mount St, Perth CBD | Supply and installation and deconstruction on completion of works of site amenities for the 500 strong labour force at the Capital Square project site. | $250k | 2016 |
Capital Square Tower 1 | Multiplex | Capital Square Site, corner of Sprint St and Mount St, Perth CBD | Supply and installation of 520 solid core timber doors including the installation of door hardware. Supply and installation of 300m2 of brushbox solid timber flooring to the ground floor entrance. Supply and installation of blackbutt timber treads, landings and 32mm diameter blackbutt handrail including all associated stainless steel fabrication, fittings and LED undermount feature lighting, supply and installation of fire and blast resistant doors and hatch, installation of sanitary hardware to 30 x levels of male and female office amenities. | $2.5m | 2016 |
Metro Hotel Provision of Construction Management Consultancy Services | Complete Design Interiors | Internal and external existing Hotel front of house, kitchen, restaurant and reception building refurbishment. Works included demolition, concrete, formwork and reinforcement, structural steel, blockwork, aluminium and glazing, roof and wall cladding, tiling and stone, ceiling and wall linings, joinery and carpentry, electrical, hydraulic, mechanical, security, IT & Comms, landscaping, decorative concrete, fencing and miscellaneous FFE and finishing works. | $2.5m | 2016 |
The team at Neesh Construction are ready to contribute to the successful delivery of your project! Whether you need design input, advice or are seeking collaboration, contact us and start the conversation.
ABOUT US
WA owned and operated Neesh Construction was established in 2015 by John Neesham who was determined to provide clients with first-class, innovative and cost-effective construction services to some of Perth’s major project and facility developments.
CONTACT US
HEAD OFFICE: 96 Forsyth St, O’Connor, WA 6163 (PO Box 112, Melville, WA 6956)
NORTH WEST BRANCH: 7 Jager St, Roebourne, WA 6718 (PO Box 217, Karratha, WA 6714)
Phone: 08 9317 8433